    Reservoir-induced landslides and risk control in Three Gorges Project on Yangtze River, China

    Yueping Yin, Bolin Huang, Wenpei Wang, Yunjie Wei, Xiaohan Ma, Fei Ma, Changjun Zhao

    2016, 8(5): 577-595.

    Abstract: The Three Gorges region in China was basically a geohazard-prone area prior to construction of the Three Gorges Reservoir (TGR). After construction of the TGR, the water level was raised from 70 m to 175 m above sea level (ASL), and annual reservoir regulation has caused a 30-m water level difference after impoundment of the TGR since September 2008. This paper first presents the spatiotemporal distribution of landsl

    The Three Gorges region in China was basically a geohazard-prone area prior to construction of the Three Gorges Reservoir (TGR). After construction of the TGR, the water level was raised from 70 m to 175 m above sea level (ASL), and annual reservoir regulation has caused a 30-m water level difference after impoundment of the TGR since September 2008. This paper first presents the spatiotemporal distribution of landslides in six periods of 175 m ASL trial impoundments from 2008 to 2014. The results show that the number of landslides sharply decreased from 273 at the initial stage to less than ten at the second stage of impoundment. Based on this, the reservoir-induced landslides in the TGR region can be roughly classified into five failure patterns, i.e. accumulation landslide, dip-slope landslide, reversed bedding landslide, rockfall, and karst breccia landslide. The accumulation landslides and dip-slope landslides account for more than 90%. Taking the Shuping accumulation landslide (a sliding mass volume of 20.7 × 106 m3) in Zigui County and the Outang dip-slope landslide (a sliding mass volume of about 90 × 106 m3) in Fengjie County as two typical cases, the mechanisms of reactivation of the two landslides are analyzed. The monitoring data and factor of safety (FOS) calculation show that the accumulation landslide is dominated by water level variation in the reservoir as most part of the mass body is under 175 m ASL, and the dip-slope landslide is controlled by the coupling effect of reservoir water level variation and precipitation as an extensive recharge area of rainfall from the rear and the front mass is below 175 m ASL. The characteristics of landslide-induced impulsive wave hazards after and before reservoir impoundment are studied, and the probability of occurrence of a landslide-induced impulsive wave hazard has increased in the reservoir region. Simulation results of the Ganjingzi landslide in Wushan County indicate the strong relationship between landslide-induced surge and water variation with high potential risk to shipping and residential areas. Regarding reservoir regulation in TGR when using a single index, i.e. 1-d water level variation, water resources are not well utilized, and there is also potential risk of disasters since 2008. In addition, various indices such as 1-d, 5-d, and 10-d water level variations are proposed for reservoir regulation. Finally, taking reservoir-induced landslides in June 2015 for example, the feasibility of the optimizing indices of water level variations is verified.

    [...]Read more.
  • Article

    Geotechnical characterization of peat-based landfill cover materials

    Afshin Khoshand, Mamadou Fall

    2016, 8(5): 596-604.

    Abstract: Natural methane (CH4) oxidation that is carried out through the use of landfill covers (biocovers) is a promising method for reducing CH4 emissions from landfills. Previous studies on peat-based landfill covers have mainly focused on their biochemical properties (e.g. CH4 oxidation capacity). However, the utilization of peat as a cover material also requires a solid understanding of its geotechnical properties (therm

    Natural methane (CH4) oxidation that is carried out through the use of landfill covers (biocovers) is a promising method for reducing CH4 emissions from landfills. Previous studies on peat-based landfill covers have mainly focused on their biochemical properties (e.g. CH4 oxidation capacity). However, the utilization of peat as a cover material also requires a solid understanding of its geotechnical properties (thermal, hydraulic, and mechanical), which are critical to the performance of any biocover. Therefore, the objective of this context is to investigate and assess the geotechnical properties of peat-based cover materials (peat, peat–sand mixture), including compaction, consolidation, and hydraulic and thermal conductivities. The studied materials show high compressibility to the increase of vertical stress, with compression index (Cc) values ranging from 0.16 to 0.358. The compressibility is a function of sand content such that the peat–sand mixture (1:3) has the lowest Cc value. Both the thermal and hydraulic conductivities are functions of moisture content, dry density, and sand content. The hydraulic conductivity varies from 1.74 × 10−9 m/s to 7.35 × 10−9 m/s, and increases with the increase in sand content. The thermal conductivity of the studied samples varies between 0.54 W/(m K) and 1.41 W/(m K) and it increases with the increases in moisture and sand contents. Increases in sand content generally increase the mechanical behavior of peat-based covers; however, they also cause relatively high hydraulic and thermal conductivities which are not favored properties for biocovers.

    [...]Read more.
  • Article
    Abstract: The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to

    The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in surrounding rock masses. The problems of rock mass deformation and failure result in considerable challenges related to project design and construction and have raised a wide range of concerns in the fields of rock mechanics and engineering. During the excavation of underground caverns, high in-situ stress and relatively low rock mass strength in combination with large excavation dimensions lead to large deformation of the surrounding rock mass and support. Existing experiences in excavation and support cannot deal with the large deformation of rock mass effectively, and further studies are needed. In this paper, the geological conditions, layout of caverns, and design of excavation and support are first introduced, and then detailed analyses of deformation and failure characteristics of rocks are presented. Based on this, the mechanisms of deformation and failure are discussed, and the support adjustments for controlling rock large deformation and subsequent excavation procedures are proposed. Finally, the effectiveness of support and excavation adjustments to maintain the stability of the rock mass is verified. The measures for controlling the large deformation of surrounding rocks enrich the practical experiences related to the design and construction of large underground openings, and the construction of caverns in the Jinping I hydropower station provides a good case study of large-scale excavation in highly stressed ground with complex geological structures, as well as a reference case for research on rock mechanics.

    [...]Read more.
  • Article
    Abstract: Fault-slip taking place in underground mines occasionally causes severe damage to mine openings as a result of strong ground motion induced by seismic waves arising from fault-slip. It is indicated from previous studies that intense seismic waves could be generated with the shock unloading of fault surface asperities during fault-slip. This study investigates the shock unloading with numerical simulation. A three-dim

    Fault-slip taking place in underground mines occasionally causes severe damage to mine openings as a result of strong ground motion induced by seismic waves arising from fault-slip. It is indicated from previous studies that intense seismic waves could be generated with the shock unloading of fault surface asperities during fault-slip. This study investigates the shock unloading with numerical simulation. A three-dimensional (3D) numerical model with idealized asperities is constructed with the help of discrete element code 3DEC. The idealization is conducted to particularly focus on simulating the shock unloading that previous numerical models, which replicate asperity degradation and crack development during the shear behavior of a joint surface in previous studies, fail to capture and simulate. With the numerical model, static and dynamic analyses are carried out to simulate unloading of asperities in the course of fault-slip. The results obtained from the dynamic analysis show that gradual stress release takes place around the center of the asperity tip at a rate of 45 MPa/ms for the base case, while an instantaneous stress release greater than 80 MPa occurs near the periphery of the asperity tip when the contact between the upper and lower asperities is lost. The instantaneous stress release becomes more intense in the vicinity of the asperity tip, causing tensile stress more than 20 MPa. It is deduced that the tensile stress could further increase if the numerical model is discretized more densely and analysis is carried out under stress conditions at a great depth. A model parametric study shows that in-situ stress state has a significant influence on the magnitude of the generated tensile stress. The results imply that the rapid stress release generating extremely high tensile stress on the asperity tip can cause intense seismic waves when it occurs at a great depth.

    [...]Read more.
  • Article

    Behavior and characteristics of compacted expansive unsaturated bentonite-sand mixture

    Mohammed Y. Fattah, Aysar H.S. Al-Lami

    2016, 8(5): 629-639.

    Abstract: Limited studies dealt with the expansive unsaturated soils in the case of large-scale model close to the field conditions and therefore, there is much more room for improvement. In this study, expansive (bentonite–sand (B–S) mixture) and non-expansive (kaolin) soils were tested in different water contents and dry unit weights chosen from the compaction curve to examine the effect of water content change on soil p

    Limited studies dealt with the expansive unsaturated soils in the case of large-scale model close to the field conditions and therefore, there is much more room for improvement. In this study, expansive (bentonite–sand (B–S) mixture) and non-expansive (kaolin) soils were tested in different water contents and dry unit weights chosen from the compaction curve to examine the effect of water content change on soil properties (swelling pressure, expansion indices, shear strength (soil cohesion) and soil suction) for the small soil samples. Large-scale model was also used to show the effect of water content change on different relations (swelling and suction with elapsed time). The study reveals that the initial soil conditions (water content and dry unit weight) affect the soil cohesion, suction and swelling, where all these parameters slightly decrease with the increase in soil water content especially on the wet side of optimum water content. The settlement of each soil at failure increases with the increase in soil degrees of saturation since the matric suction reduces the soil ability to deform. The settlement observed in B–S mixture is higher than that in kaolin due to the effect of higher swelling observed in B–S mixture and the huge amount of water absorbed which transformed the soil to highly compressible soil. The matric suction seems to decrease with elapsed time from top to bottom of tensiometers due to the effect of water flowing from top of the specimen. The tensiometer reading at first of the saturation process is lower than that at later period of saturation (for soil sample B–S3, the tensiometer #1 took 3 d to drop from 93 kPa to 80 kPa at early stage, while the same tensiometer took 2 d to drop from 60 kPa to 20 kPa).

    [...]Read more.
  • Article

    Engineering rock mechanics practices in the underground powerhouse at Jinping I hydropower station

    Aiqing Wu, Jimin Wang, Zhong Zhou, Shuling Huang, Xiuli Ding, Zhihong Dong, Yuting Zhang

    2016, 8(5): 640-650.

    Abstract: Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. The distribution of strata, lithology, and initial geo-stress, the excavation process and corresponding rock mass support measures, the deformation and failure characteristics of the surrounding rock mass

    Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. The distribution of strata, lithology, and initial geo-stress, the excavation process and corresponding rock mass support measures, the deformation and failure characteristics of the surrounding rock mass, the stress characteristics of anchorage structures in the cavern complex, and numerical simulations of surrounding rock mass stability and anchor support performance are presented. The results indicate that the underground powerhouse of Jinping I hydropower station is characterized by high to extremely high geo-stresses during rock excavation. Excessive surrounding rock mass deformation and high stress of anchorage structures, surrounding rock mass unloading damage, and local cracking failure of surrounding rock masses, etc., are mainly caused by rock mass excavation. Deformations of surrounding rock masses and stresses in anchorage structures here are larger than those found elsewhere: 20% of extensometers in the main powerhouse record more than 50 mm with the maximum at around 250 mm observed in the downstream sidewall of the transformer hall. There are about 25% of the anchor bolts having recorded stresses of more than 200 MPa. Jinping I hydropower plant is the first to have an underground powerhouse construction conducted in host rocks under extremely high geo-stress conditions, with the ratio of rock mass strength to geo-stress of less than 2.0. The results can provide a reference to underground powerhouse construction in similar geological conditions.

    [...]Read more.
  • Article
    Abstract: Deep mixed column (DMC) is known as one of the effective methods for stabilizing the natural earth beneath road or railway embankments to control stability and settlements under traffic loads. The load distribution mechanism of embankment overlying on loose subgrades stabilized with DMCs considerably depends on the columns' mechanical and geometrical specifications. The present study uses the laboratory investigation

    Deep mixed column (DMC) is known as one of the effective methods for stabilizing the natural earth beneath road or railway embankments to control stability and settlements under traffic loads. The load distribution mechanism of embankment overlying on loose subgrades stabilized with DMCs considerably depends on the columns' mechanical and geometrical specifications. The present study uses the laboratory investigation to understand the behavior of embankments lying on loose sandy subgrade in three different conditions: (1) subgrade without reinforcement, (2) subgrade reinforced with DMCs in a triangular pattern and horizontal plan, and (3) subgrade reinforced with DMCs in a square pattern and horizontal plan. For this purpose, by adopting the scale factor of 1:10, a reference embankment with 20 cm height, 250 cm length, and 93% maximum dry density achieved in standard Proctor compaction test was constructed over a 70 cm thick loose sandy bed with the relative density of 50% in a loading chamber, and its load-displacement behavior was evaluated until the failure occurred. In the next two tests, DMCs (with 10 cm diameter, 40 cm length, and 25 cm center-to-center spacing) were placed in groups in two different patterns (square and triangular) in the same sandy bed beneath the embankment and, consequently, the embankments were constructed over the reinforced subgrades and gradually loaded until the failure happened. In all the three tests, the load-displacement behaviors of the embankment and the selected DMCs were instrumented for monitoring purpose. The obtained results implied 64% increase in failure load and 40% decrease in embankment crest settlement when using the square pattern of DMCs compared with those of the reference embankment, while these values were 63% and 12%, respectively, for DMCs in triangular pattern. This confirmed generally better performance of DMCs with a triangular pattern.

    [...]Read more.
  • Article

    Influence of fault slip on mining-induced pressure and optimization of roadway support design in fault-influenced zone

    Hongwei Wang, Yaodong Jiang, Sheng Xue, Lingtao Mao, Zhinan Lin, Daixin Deng, Dengqiang Zhang

    2016, 8(5): 660-671.

    Abstract: This paper presents an investigation on the characteristics of overlying strata collapse and mining-induced pressure in fault-influenced zone by employing the physical modeling in consideration of fault structure. The precursory information of fault slip during the underground mining activities is studied as well. Based on the physical modeling, the optimization of roadway support design and the field verification in

    This paper presents an investigation on the characteristics of overlying strata collapse and mining-induced pressure in fault-influenced zone by employing the physical modeling in consideration of fault structure. The precursory information of fault slip during the underground mining activities is studied as well. Based on the physical modeling, the optimization of roadway support design and the field verification in fault-influenced zone are conducted. Physical modeling results show that, due to the combined effect of mining activities and fault slip, the mining-induced pressure and the extent of damaged rock masses in the fault-influenced zone are greater than those in the uninfluenced zone. The sharp increase and the succeeding stabilization of stress or steady increase in displacement can be identified as the precursory information of fault slip. Considering the larger mining-induced pressure in the fault-influenced zone, the new support design utilizing cables is proposed. The optimization of roadway support design suggests that the cables can be anchored in the stable surrounding rocks and can effectively mobilize the load bearing capacity of the stable surrounding rocks. The field observation indicates that the roadway is in good condition with the optimized roadway support design.

    [...]Read more.
  • Article

    Stone column settlement performance in structured anisotropic clays: the influence of creep

    Brian G. Sexton, Bryan A. McCabe, Minna Karstunen, Nallathamby Sivasithamparam

    2016, 8(5): 672-688.

    Abstract: The recently developed elasto-viscoplastic Creep-SCLAY1S model has been used in conjunction with PLAXIS 2D to investigate the effectiveness of vibro-replacement in a creep-prone clay. The Creep-SCLAY1S model accounts for anisotropy, bonding, and destructuration, and uses the concept of a constant rate of viscoplastic multiplier to calculate creep strain rate. A comparison of settlement improvement factors with and wi

    The recently developed elasto-viscoplastic Creep-SCLAY1S model has been used in conjunction with PLAXIS 2D to investigate the effectiveness of vibro-replacement in a creep-prone clay. The Creep-SCLAY1S model accounts for anisotropy, bonding, and destructuration, and uses the concept of a constant rate of viscoplastic multiplier to calculate creep strain rate. A comparison of settlement improvement factors with and without creep indicates that ‘total’ settlement improvement factors (primary plus creep) are lower than their ‘primary’ counterparts (primary settlement only). The lowest settlement improvement factors arise for analyses incorporating the effect of bonding and destructuration. Examination of the variations of vertical stress with time and depth has indicated that vertical stress is transferred from the soil to the column as the soil creeps. This results in additional column yielding. In addition, the radial and hoop stresses in the soil are lower for the ‘creep’ case. The reduced radial stresses lead to additional column bulging and hence more settlement, whereas the hoop stress reductions appear to be a secondary effect, caused by additional plastic deformation for the ‘creep’ case.

    [...]Read more.
  • Article

    Design and operation problems related to water curtain system for underground water-sealed oil storage caverns

    Zhongkui Li, Baoqi Lu, Jing Zou, Bin Xu, Zhizeng Zhang

    2016, 8(5): 689-696.

    Abstract: The underground water-sealed storage technique is critically important and generally accepted for the national energy strategy in China. Although several small underground water-sealed oil storage caverns have been built in China since the 1970s, there is still a lack of experience for large-volume underground storage in complicated geological conditions. The current design concept of water curtain system and the tec

    The underground water-sealed storage technique is critically important and generally accepted for the national energy strategy in China. Although several small underground water-sealed oil storage caverns have been built in China since the 1970s, there is still a lack of experience for large-volume underground storage in complicated geological conditions. The current design concept of water curtain system and the technical instruction for system operation have limitations in maintaining the stability of surrounding rock mass during the construction of the main storage caverns, as well as the long-term stability. Although several large-scale underground oil storage projects are under construction at present in China, the design concepts and construction methods, especially for the water curtain system, are mainly based on the ideal porosity medium flow theory and the experiences gained from the similar projects overseas. The storage projects currently constructed in China have the specific features such as huge scale, large depth, multiple-level arrangement, high seepage pressure, complicated geological conditions, and high in situ stresses, which are the challenging issues for the stability of the storage caverns. Based on years’ experiences obtained from the first large-scale (millions of cubic meters) underground water-sealed oil storage project in China, some design and operation problems related to water curtain system during project construction are discussed. The drawbacks and merits of the water curtain system are also presented. As an example, the conventional concept of “filling joints with water” is widely used in many cases, as a basic concept for the design of the water curtain system, but it is immature. In this paper, the advantages and disadvantages of the conventional concept are pointed out, with respect to the long-term stability as well as the safety of construction of storage caverns. Finally, new concepts and principles for design and construction of the underground water-sealed oil storage caverns are proposed.

    [...]Read more.
  • Article

    Interaction analysis of back-to-back mechanically stabilized earth walls

    Sadok Benmebarek, Samir Attallaoui, Naï, ma Benmebarek

    2016, 8(5): 697-702.

    Abstract: Back-to-back mechanically stabilized earth walls (BBMSEWs) are encountered in bridge approaches, ramp ways, rockfall protection systems, earth dams, levees and noise barriers. However, available design guidelines for BBMSEWs are limited and not applicable to numerical modeling when back-to-back walls interact with each other. The objective of this paper is to investigate, using PLAXIS code, the effects of the reducti

    Back-to-back mechanically stabilized earth walls (BBMSEWs) are encountered in bridge approaches, ramp ways, rockfall protection systems, earth dams, levees and noise barriers. However, available design guidelines for BBMSEWs are limited and not applicable to numerical modeling when back-to-back walls interact with each other. The objective of this paper is to investigate, using PLAXIS code, the effects of the reduction in the distance between BBMSEW, the reinforcement length, the quality of backfill material and the connection of reinforcements in the middle, when the back-to-back walls are close. The results indicate that each of the BBMSEWs behaves independently if the width of the embankment between mechanically stabilized earth walls is greater than that of the active zone. This is in good agreement with the result of FHWA design guideline. However, the results show that the FHWA design guideline underestimates the lateral earth pressure when back-to-back walls interact with each other. Moreover, for closer BBMSEWs, FHWA design guideline strongly overestimates the maximum tensile force in the reinforcement. The investigation of the quality of backfill material shows that the minor increase in embankment cohesion can lead to significant reductions in both the lateral earth pressure and the maximum tensile force in geosynthetic. When the distance between the two earth walls is close to zero, the connection of reinforcement between back-to-back walls significantly improves the factor of safety.

    [...]Read more.
  • Article
    Abstract: The stability of shallow tunnels excavated in full face has been a major challenge to the scientific community for a long time. In recent years, new techniques based on the installation of a pre-reinforcement system ahead of the tunnel face were developed to control the deformations and surface settlements induced by the excavation and to ensure the sustainability of the tunnel in the long term. In this paper, a fin

    The stability of shallow tunnels excavated in full face has been a major challenge to the scientific community for a long time. In recent years, new techniques based on the installation of a pre-reinforcement system ahead of the tunnel face were developed to control the deformations and surface settlements induced by the excavation and to ensure the sustainability of the tunnel in the long term. In this paper, a finite difference numerical simulation was conducted to study the behaviors and effects of two pre-reinforcement systems, i.e. the face bolting and the umbrella arch system installed in a section of southern Toulon tunnel in France. For this purpose, two approaches were taken and compared: a two-dimensional (2D) approach based on the convergence–confinement method, and a three-dimensional (3D) approach taking into account the complete modeling of the tunnel. A 2D numerical back-analysis was performed to identify the geomechanical parameters that offer satisfactory agreement with the measurement results. The limit of this method lies in the exact choice of the stress relaxation ratio λ. To overcome this uncertainty, a 3D model was developed, which permitted to study the influence of different pre-support systems on the reaction of ground mass. Both 2D and 3D numerical approaches have been fitted to measurements recorded in a section of the Toulon tunnel and the very satisfactory correspondence has allowed validating the simulations. The results show that the 3D numerical analysis with a full discretization of the inclusions seems unquestionably the most reliable approach.

    [...]Read more.
  • Article

    Effect of adding natural pozzolana on geotechnical properties of lime-stabilized clayey soil

    Aref al-Swaidani, Ibrahim Hammoud, Ayman Meziab

    2016, 8(5): 714-725.

    Abstract: Clayey soils in Syria cover a total area of more than 20,000 km2 of the country, most of which are located in the southwestern region. In many places of the country, the clayey soils caused severe damage to infrastructures. Extensive studies have been carried out on the stabilization of clayey soils using lime. Syria is rich in both lime and natural pozzolana. However, few works have been conducted to investigate th

    Clayey soils in Syria cover a total area of more than 20,000 km2 of the country, most of which are located in the southwestern region. In many places of the country, the clayey soils caused severe damage to infrastructures. Extensive studies have been carried out on the stabilization of clayey soils using lime. Syria is rich in both lime and natural pozzolana. However, few works have been conducted to investigate the influence of adding natural pozzolana on the geotechnical properties of lime-treated clayey soils. The aim of this paper is to understand the effect of adding natural pozzolana on some geotechnical properties of lime-stabilized clayey soils. Natural pozzolana and lime are added to soil within the range of 0%–20% and 0%–8%, respectively. Consistency, compaction, California bearing ratio (CBR) and linear shrinkage properties are particularly investigated. The test results show that the investigated properties of lime-treated clayey soils can be considerably enhanced when the natural pozzolana is added as a stabilizing agent. Analysis results of scanning electron microscopy (SEM) and energy-dispersive X-ray spectroscopy (EDX) show significant changes in the microstructure of the treated clayey soil. A better flocculation of clayey particles and further formation of cementing materials in the natural pozzolana-lime-treated clayey soil are clearly observed.

    [...]Read more.
  • Article

    Nondestructive testing and assessment of consolidation effects of earthen sites

    Xudong Wang, Qinglin Guo, Shanlong Yang, Dexuan Zhang, Yanwu Wang

    2016, 8(5): 726-733.

    Abstract: Earthen sites are widely distributed throughout China, and most of them belong to archaeological sites with significant values, which not only directly witness the origin, formation and development of Chinese civilization, but also possess important values for conservation and exhibition. Many researches and practices on their conservation and consolidation have been carried out; however, the consolidation effect is

    Earthen sites are widely distributed throughout China, and most of them belong to archaeological sites with significant values, which not only directly witness the origin, formation and development of Chinese civilization, but also possess important values for conservation and exhibition. Many researches and practices on their conservation and consolidation have been carried out; however, the consolidation effect is mainly judged by visual observation and expert evaluation. Scientific assessment of conservation and consolidation effects is a challenging issue. Many instruments in other fields cannot be directly applied to the conservation of cultural relics due to their peculiarity. In order to assess the effects of field conservation experiments, this paper tries to understand the consolidation effects at Liangzhu site using nondestructive or micro-damage methods, including thermo-physical parameters testing, infrared thermal imaging, high-density microelectrode resistivity testing, portable microscope observation, and hydrophilic and hydrophobic testing, and thereby explores the practicable methods for evaluating the properties of consolidation materials for earthen sites treatment.

    [...]Read more.
  • Article
    Abstract: Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on

    Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

    [...]Read more.
  • Article

    Influence of zeolite and cement additions on mechanical behavior of sandy soil

    Hossein Mola-Abasi, Issa Shooshpasha

    2016, 8(5): 746-752.

    Abstract: It is well known that the cemented sand is one of economic and environmental topics in soil stabilization. In this instance, a blend of sand, cement and other materials such as fiber, glass, nanoparticle and zeolite can be commercially available and effectively used in soil stabilization in road construction. However, the influence and effectiveness of zeolite on the properties of cemented sand systems have not been

    It is well known that the cemented sand is one of economic and environmental topics in soil stabilization. In this instance, a blend of sand, cement and other materials such as fiber, glass, nanoparticle and zeolite can be commercially available and effectively used in soil stabilization in road construction. However, the influence and effectiveness of zeolite on the properties of cemented sand systems have not been completely explored. In this study, based on an experimental program, the effects of zeolite on the characteristics of cemented sands are investigated. Stabilizing agent includes Portland cement of type II and zeolite. Results show the improvements of unconfined compressive strength (UCS) and failure properties of cemented sand when the cement is replaced by zeolite at an optimum proportion of 30% after 28 days. The rate of strength improvement is approximately between 20% and 78%. The efficiency of using zeolite increases with the increases in cement amount and porosity. Finally, a power function of void-cement ratio and zeolite content is demonstrated to be an appropriate method to assess UCS of zeolite-cemented mixtures.

    [...]Read more.
  • Review

    Protection against water or mud inrush in tunnels by grouting: A review

    Shucai Li, Rentai Liu, Qingsong Zhang, Xiao Zhang

    2016, 8(5): 753-766.

    Abstract: Grouting is a major method used to prevent water and mud inrush in tunnels and underground engineering. In this paper, the current situation of control and prevention of water and mud inrush is summarized and recent advances in relevant theories, grout/equipment, and critical techniques are introduced. The time-variant equations of grout viscosity at different volumetric ratios were obtained based on the constitutive

    Grouting is a major method used to prevent water and mud inrush in tunnels and underground engineering. In this paper, the current situation of control and prevention of water and mud inrush is summarized and recent advances in relevant theories, grout/equipment, and critical techniques are introduced. The time-variant equations of grout viscosity at different volumetric ratios were obtained based on the constitutive relation of typical fast curing grouts. A large-scale dynamic grouting model testing system (4000 mm × 2000 mm × 5 mm) was developed, and the diffusions of cement and fast curing grouts in dynamic water grouting were investigated. The results reveal that the diffusions of cement grouts and fast curing grouts are U-shaped and asymmetric elliptical, respectively. A multi-parameter real-time monitoring system (ϕ = 1.5 m, h = 1.2 m) was developed for the grouting process to study the diffusion and reinforcement mechanism of grouting in water-rich faulted zone. A high early strength cream-type reinforcing/plugging grout, a high permeability nano-scale silica gel grout, and a high-expansion filling grout were proposed for the control of water hazards in weak water-rich faulted zone rocks, water inrush in karst passages, and micro-crack water inrush, respectively. Complement technologies and equipment for industrial applications were also proposed. Additionally, a novel full-life periodic dynamic water grouting with the critical grouting borehole as the core was proposed. The key techniques for the control of water inrush in water-rich faulted zone, jointed fissures and karst passages, and micro-crack water inrush were developed.

    [...]Read more.
  • Review

    Biological process of soil improvement in civil engineering: A review

    Murtala Umar, Khairul Anuar Kassim, Kenny Tiong Ping Chiet

    2016, 8(5): 767-774.

    Abstract: The concept of using biological process in soil improvement which is known as bio-mediated soil improvement technique has shown greater potential in geotechnical engineering applications in terms of performance and environmental sustainability. This paper presents a review on the soil microorganisms responsible for this process, and factors that affect their metabolic activities and geometric compatibility with the s

    The concept of using biological process in soil improvement which is known as bio-mediated soil improvement technique has shown greater potential in geotechnical engineering applications in terms of performance and environmental sustainability. This paper presents a review on the soil microorganisms responsible for this process, and factors that affect their metabolic activities and geometric compatibility with the soil particle sizes. Two mechanisms of biomineralization, i.e. biologically controlled and biologically induced mineralization, were also discussed. Environmental and other factors that may be encountered in situ during microbially induced calcite precipitation (MICP) and their influences on the process were identified and presented. Improvements in the engineering properties of soil such as strength/stiffness and permeability as evaluated in some studies were explored. Potential applications of the process in geotechnical engineering and the challenges of field application of the process were identified.

    [...]Read more.

Latest Issue