JRMGE / Vol 8 / Issue 4

Article

Key technologies and risk management of deep tunnel construction at Jinping II hydropower station

Chunsheng Zhang, Ning Liu, Weijiang Chu


2016, 8(4): 499-512.


Received: 1900-01-01 / Revised: 1900-01-01 / Accepted: 1970-01-01 / Available online: 2016-08-15

2016, 8(4): 499-512.


Received: 1900-01-01

Revised: 1900-01-01

Accepted: 1970-01-01

Available online: 2016-08-15


Abstract: The four diversion tunnels at Jinping II hydropower station represent the deepest underground project yet conducted in China, with an overburden depth of 1500–2000 m and a maximum depth of 2525 m. The tunnel structure was subjected to a maximum external water pressure of 10.22 MPa and the maximum single-point groundwater inflow of 7.3 m3/s. The success of the project construction was related to numerous challenging issues such as the stability of the rock mass surrounding the deep tunnels, strong rockburst prevention and control, and the treatment of high-pressure, large-volume groundwater infiltration. During the construction period, a series of new technologies was developed for the purpose of risk control in the deep tunnel project. Nondestructive sampling and in-situ measurement technologies were employed to fully characterize the formation and development of excavation damaged zones (EDZs), and to evaluate the mechanical behaviors of deep rocks. The time effect of marble fracture propagation, the brittle–ductile–plastic transition of marble, and the temporal development of rock mass fracture and damage induced by high geostress were characterized. The safe construction of deep tunnels was achieved under a high risk of strong rockburst using active measures, a support system comprised of lining, grouting, and external water pressure reduction techniques that addressed the coupled effect of high geostress, high external water pressure, and a comprehensive early-warning system. A complete set of technologies for the treatment of high-pressure and large-volume groundwater infiltration was developed. Monitoring results indicated that the Jinping II hydropower station has been generally stable since it was put into operation in 2014

Download PDF:


Keywords: Jinping II hydropower station, Deep tunnels, High geostress, High external water pressure, Rockburst, Groundwater

Share and Cite

Chunsheng Zhang, Ning Liu, Weijiang Chu, 2016. Key technologies and risk management of deep tunnel construction at Jinping II hydropower station. J. Rock Mech. Geotech. Eng. 8 (4), 499-512.